THE INDUSTRY

What changed in Thailand's PCB industry recently?

The MPBxChange tracker logs 69 dated, sourced events in Thailand's PCB industry from 2022 to 30 October 2026. The newest, dated 30 October 2026: Victory Giant Technology disclosed that its board had approved, on 29 October, up to USD 800 million of additional investment in its Thai subsidiary in Bang Pa-In, Ayutthaya, mainly for factory buildings and equipment, subject to a shareholders' meeting and filings or approvals by the relevant authorities.

  • 26 October 2026, Ventec International Group: Ventec International Group officially opened its PCB materials plant in Ayutthaya, its first production site in Southeast Asia, with production planned to ramp up gradually through 2028.
  • 26 October 2026, Ventec International Group: Ventec International Group's Ayutthaya plant was reported at its opening to have begun small-volume shipments, with formal mass production expected at the end of 2026.
  • 25 October 2026, Benchuan Intelligent (Jiangsu Allfavor): Benchuan Intelligent told investors that its Thai plant, which broke ground in March 2026, was expected to start production in the fourth quarter of 2027 with a capacity of 400,000 square metres of high-layer-count boards.
  • 22 October 2026, Nanya New Material: Nanya New Material held the groundbreaking ceremony for its Thailand production base in Prachin Buri, which the company describes as part of its high-end copper-clad laminate business.
  • 20 October 2026, Dongshan Precision: Dongshan Precision's Hong Kong listing prospectus listed its Chon Buri PCB plant, established in 2023, with a gross floor area of 155,976 square metres, and disclosed that the registered capital of Multi-Fineline Electronics (Thailand) rose from THB 3.5 billion to THB 5 billion on 8 June 2026.

The 10 newest events, newest first

DateCompanyEventSource
30 October 2026Victory Giant TechnologyFiling. Victory Giant Technology disclosed that its board had approved, on 29 October, up to USD 800 million of additional investment in its Thai subsidiary in Bang Pa-In, Ayutthaya, mainly for factory buildings and equipment, subject to a shareholders' meeting and filings or approvals by the relevant authorities.CNINFO, Shenzhen Stock Exchange filing, stock code 300476
26 October 2026Ventec International GroupOpening. Ventec International Group officially opened its PCB materials plant in Ayutthaya, its first production site in Southeast Asia, with production planned to ramp up gradually through 2028.Evertiq
26 October 2026Ventec International GroupFiling. Ventec International Group's Ayutthaya plant was reported at its opening to have begun small-volume shipments, with formal mass production expected at the end of 2026.Anue (鉅亨網, cnyes)
25 October 2026Benchuan Intelligent (Jiangsu Allfavor)Filing. Benchuan Intelligent told investors that its Thai plant, which broke ground in March 2026, was expected to start production in the fourth quarter of 2027 with a capacity of 400,000 square metres of high-layer-count boards.CNINFO, Shenzhen Stock Exchange investor relations record, stock code 300964
22 October 2026Nanya New MaterialGroundbreaking. Nanya New Material held the groundbreaking ceremony for its Thailand production base in Prachin Buri, which the company describes as part of its high-end copper-clad laminate business.Guangdong Printed Circuit Association (GPCA), from Nanya New Material (南亚新材NOUYA)
20 October 2026Dongshan PrecisionFiling. Dongshan Precision's Hong Kong listing prospectus listed its Chon Buri PCB plant, established in 2023, with a gross floor area of 155,976 square metres, and disclosed that the registered capital of Multi-Fineline Electronics (Thailand) rose from THB 3.5 billion to THB 5 billion on 8 June 2026.HKEXnews, Suzhou Dongshan Precision Manufacturing Co., Ltd. (stock code 2384)
19 October 2026Sihui Fuji ElectronicsFiling. Sihui Fuji told investors that the Thai phase-two building was expected to be finished at the end of November and that its first mSAP line is expected to start production in the second quarter of 2027.CNINFO, Shenzhen Stock Exchange filing, stock code 300852
2 September 2026U.S. Customs and Border ProtectionTrade measure. US Customs and Border Protection opened an advance notice of proposed rulemaking on wider import disclosures aimed at illegally transshipped goods, with comments due by 1 December 2026.Federal Register, via govinfo.gov
September 2026Thailand Board of InvestmentRule. The BOI announced that it would phase out tax breaks for low-margin operations and measure success by realised investment rather than application volume.Thailand Board of Investment, One Start One Stop Investment Center (OSOS)
29 August 2026Suntak TechnologyFiling. Suntak Technology put the first phase of its Prachin Buri plant at about RMB 1 billion and expected it to be built in the first quarter of 2027.Shenzhen Stock Exchange disclosure via CNINFO

How this was counted

Built from the newest rows of the MPBxChange tracker of Thailand's PCB industry. Each row quotes at least one source (company announcements, exchange filings, BOI releases, government notices or trade press), carries its date at the precision the source gives, and reports plans and targets as the company or agency stated them.

Records last reviewed