PCB materials made in Thailand: Ventec opens in Ayutthaya

Ventec opened its PCB materials plant in Ayutthaya on 26 October 2026, its first in Southeast Asia. The register lists nine materials plants in Thailand, from operating to announced.

MPBxChange research · Published 28 October 2026 · Updated 31 October 2026 · 10 min read · 21 sources

PCB materials made in Thailand: Ventec opens in Ayutthaya

Key points

  • Ventec International Group, a PCB materials supplier, officially opened its plant in Ayutthaya on 26 October 2026, its first production site in Southeast Asia, to make prepreg, bond-ply and laminates. Its manufacturing had until then been in China and Taiwan.[1]
  • The site is 8.4 acres in the Hi-Tech Industrial Estate, and the company put the investment at US$17 million when it chose Thailand in December 2024.[5]
  • At full capacity the plant is planned to make about 3 million square metres of prepreg a month and 80,000 square metres of bond-ply, with production ramping up gradually through 2028.[3][1]
  • Ventec has not published output or utilisation for the plant, and commercial supply depends on process commissioning, qualification of material grades and customer approvals.[2] Small-volume shipments had begun by the opening day, with formal mass production expected at the end of 2026.[13]
  • The MPBxChange register lists nine materials plants in Thailand: three operating (Ventec, ITEQ and MGC Electrotechno), three approved by the BOI on 8 July 2026 (Taiwan Union Technology, Doosan Electro-Materials and Fulltech Fiber Glass), two under construction (Shengyi Technology in Chachoengsao and Nanya New Material in Prachin Buri, where ground was broken on 22 October 2026) and one announced (Panasonic Industry's MEGTRON building in Ayutthaya).[1][9][11][6][18][21][10]

Context

A printed circuit board is built from copper-clad laminate cores bonded together with prepreg, glass cloth impregnated with partly cured resin. The board plants in Thailand are covered by the MPBxChange plant register and by who owns them; the 2026 supply of glass cloth, copper foil and laminate is covered in the material shortage article. This article covers the layer above the board plants: the materials made inside Thailand.

Ventec International Group Co., Ltd. trades in Taiwan under the code 6672.[4] Before the Thai plant, its manufacturing was in China and Taiwan.[1]

The Ventec plant in Ayutthaya

  1. 17 December 2024
    • ReportedVentec names Thailand as the site: 8.4 acres in the Hi-Tech Industrial Estate, Ayutthaya; a US$17 million investment.[5]
  2. 17 December 2024
    • PlanPlan: 150,000 sheets a month in phase one.[5]
  3. 30 July 2025
    • ReportedGroundbreaking ceremony; the factory covers about 35,000 square metres.[4]
  4. 30 July 2025
    • PlanPlan: trial production in the first quarter of 2026 and full-scale production in the second quarter of 2026.[4]
  5. 18 March 2026
    • PlanPlan: ramp-up between 2026 and 2028; at full capacity about 3 million square metres of prepreg a month and 80,000 square metres of bond-ply.[3]
  6. 26 October 2026
    • ReportedOfficial opening, Ventec's first production site in Southeast Asia, to make prepreg, bond-ply and laminates.[1]
  7. 26 October 2026
    • PlanPlan: production ramps up gradually through 2028.[1]
  8. 26 October 2026
    • ReportedSmall-volume shipments of laminate and bonding sheet under way, as reported on the opening day.[13]
  9. 26 October 2026
    • PlanPlan: formal mass production at the end of 2026; treating capacity from 2027 raises total design capacity by a further 15%.[13]
Ventec's plant in Ayutthaya: what was reported, and when. Copper: events reported as having happened. Plan: the company's stated intentions, not output. Sources: Ventec International Group newsroom, 17 December 2024 and 1 August 2025; Evertiq, 18 March and 26 October 2026; Anue (cnyes.com), 26 October 2026.

On 17 December 2024 Ventec confirmed Thailand as the location of a new PCB material plant, to be built on 8.4 acres in the Hi-Tech Industrial Estate, north of Bangkok in Ayutthaya province. It described the US$17 million investment as an expansion of its manufacturing beyond China and Taiwan, and set a capacity of 150,000 sheets a month for phase one.[5]

The groundbreaking ceremony took place on the morning of 30 July 2025, at what the company called the Hi-Tech Industrial Park in Ayutthaya. The factory covers about 35,000 square metres. The plan at that date was trial production in the first quarter of 2026 and full-scale production in the second quarter of 2026, with the first factory in use in early 2026 for copper foil substrates and adhesive sheets.[4]

In March 2026 the company said production at the site would ramp up gradually between 2026 and 2028.[3] The official opening followed on 26 October 2026. The plant will make prepreg, bond-ply and laminates for high-reliability boards in sectors such as aerospace, defence, industry and medical technology, with production ramping up gradually through 2028.[1] On the opening day, Anue (cnyes.com) reported that the plant had begun small-volume shipments of laminate and bonding sheet, with formal mass production expected at the end of 2026. Treating capacity is to follow from 2027, and is expected to raise the plant's total design capacity by a further 15%.[13]

ItemFigureStatedSource
Site8.4 acres, Hi-Tech Industrial Estate, AyutthayaDecember 2024[5]
InvestmentUS$17 millionDecember 2024[5]
Phase one capacity150,000 sheets a monthDecember 2024[5]
Factory areaAbout 35,000 square metresAugust 2025[4]
ProductsPrepreg, bond-ply and laminatesOctober 2026[1]
Prepreg at full capacityAbout 3 million square metres a monthMarch 2026[3]
Bond-ply at full capacity80,000 square metres, reported alongside the monthly prepreg figureMarch 2026[3]
Ramp-upGradual, 2026 to 2028March and October 2026[3][1]
ShipmentsSmall-volume shipments begun; formal mass production expected at the end of 2026October 2026[13]
Treating capacityFrom 2027, raising total design capacity by a further 15%October 2026[13]

Stated capacity and the ramp to 2028

The capacity figures are plans. The prepreg and bond-ply figures describe the plant at full capacity, which the company places at the end of a ramp running to 2028.[3][1] They describe planned manufacturing capability, not the volume produced when the factory opened in October, and Ventec has not provided confirmed output or utilisation figures for the plant.[2]

The schedule has been restated as the project advanced. The groundbreaking plan of 2025 named full-scale production for the second quarter of 2026.[4] The statements of March and October 2026 describe a gradual ramp to 2028 instead of a single start date.[3][1] The report of the opening day places formal mass production at the end of 2026.[13]

Register of PCB-materials plants in Thailand

PlantParent and listingMaterialProvince and estateStage, dateSources
Ventec International Group, Thailand plantVentec International Group Co., Ltd.
Stock code 6672 TT
Laminate and prepreg: Prepreg, Bond-ply, LaminatePhra Nakhon Si Ayutthaya
Hi-Tech Industrial Estate
Operating
26 October 2026
[1][2][3][4][5][13]
ITEQ, Thailand plantITEQ Corporation (聯茂)
Stock code 6213
Laminate and prepreg: Copper-clad laminatenot stated
not stated
Operating
8 October 2026
[9]
MGC Electrotechno (Thailand) Co., Ltd.MGC Electrotechno Co., Mitsubishi Gas Chemical group
not stated
Package-substrate materials: BT materials for semiconductor packagesnot stated
not stated
Operating
11 November 2025
[11]
Shengyi Technology (Thailand) Co., Ltd.Guangdong Shengyi Technology Co., Ltd. (生益科技)
Stock code 600183, Shanghai
Laminate and prepreg: Copper-clad laminate, PrepregChachoengsao
TFD Industrial Estate Phase II
Under construction
15 August 2026
[14][15][16][17][18]
Nanya New Material Technology (Thailand) Co., Ltd.Nanya New Material Technology Co., Ltd. (南亚新材)
Stock code 688519, Shanghai STAR Market
Laminate and prepreg: Copper-clad laminate, PrepregPrachin Buri
not stated
Under construction
22 October 2026
[19][20][21]
Taiwan Union Technology (Thailand) Co., Ltd.Taiwan Union Technology (TUC)
not stated
Laminate and prepreg: Copper-clad laminate, PrepregChon Buri
not stated
Approved
8 July 2026
[6]
Doosan Electro-Materials (Thailand) Co., Ltd.Doosan Corp.
not stated
Laminate and prepreg: Copper-clad laminate, PrepregSamut Prakan
Araya Industrial Park, as named by the Korea Times
Approved
8 July 2026
[6][7]
Fulltech Fiber Glass (Thailand) Co., Ltd.Fulltech Fiber Glass (富喬工業)
Stock code 1815
Glass yarn and glass cloth: Glass fibre fabricChachoengsao
not stated
Approved
8 July 2026
[6][8]
Panasonic Industry, new MEGTRON building at the Ayutthaya PlantPanasonic Industry Co., Ltd.
not stated
Laminate and prepreg: MEGTRON multi-layer circuit board materialsPhra Nakhon Si Ayutthaya
Rojana Industrial Park
Announced
12 September 2025
[10]
PCB-materials plants in Thailand confirmed by a primary source or two independent sources, including materials for semiconductor package substrates. Stage is the latest reported step. Planned capacity is set out in the text. Not stated: the sources do not give it. Checked on 31 October 2026.

The register covers plants that make inputs for bare boards (copper-clad laminate and prepreg, copper foil, glass yarn and glass cloth, and, where sourced, dry film, solder mask and process chemicals) and plants that make materials for semiconductor package substrates. Each row gives the company, its parent and listing, the product, the province and estate, the latest reported stage with its date, and the sources. The four stages are announced, approved, under construction and operating. Where the sources do not give a province, an estate or a listing, the register says so.

Operating

Ventec's plant is listed as operating from its opening on 26 October 2026; its earlier stages were the site announcement of December 2024 and the start of construction in July 2025.[5][4][1]

ITEQ's Thai plant had copper-clad laminate capacity of about 300,000 sheets a month in October 2026, according to the Liberty Times. The plant was expanding to 600,000 sheets a month by the end of 2026, and a 600,000-sheet expansion plan for a second plant had been launched, for a planned 1.2 million sheets a month by the end of 2028. The report does not name the province.[9]

MGC Electrotechno (Thailand), a subsidiary of MGC Electrotechno in the Mitsubishi Gas Chemical group, makes BT materials for semiconductor packages. The group established it in Thailand in 2012, and in November 2025 Mitsubishi Gas Chemical announced the completion of an additional plant that doubles its production capacity. The report does not name the province.[11]

Under construction

Shengyi Technology (Thailand), a subsidiary of Guangdong Shengyi Technology (Shanghai, 600183), is building a copper-clad laminate and prepreg plant at the TFD Industrial Estate Phase II in Chachoengsao. The board of the parent approved the project on 28 July 2023, with an investment of RMB 1.4 billion (about US$200 million) to be built in phases.[14] The groundbreaking took place on 18 December 2024,[15] and the Thai company received its BOI investment promotion certificate in June 2025.[16] The structure was topped out on 16 January 2026, when the company described the plan as 12 million square metres of high-performance copper-clad laminate and 23.4 million metres of prepreg (bonding sheet) a year.[17] In its interim report for 2026, filed on 15 August 2026, the parent attributes part of the rise in construction in progress to net spending on the Thai plant's phase-one project.[18]

Nanya New Material Technology (Shanghai STAR Market, 688519) held the groundbreaking ceremony for its Thai production base in Prachin Buri province on 22 October 2026, which the company describes as a key step for its high-end copper-clad laminate business.[21] Its board approved a copper-clad laminate and prepreg base in Thailand, with an investment of not more than RMB 700 million, on 25 June 2023,[19] and the Thai company had received its BOI investment promotion certificate by March 2025.[20] The sources give no capacity or start date.

Approved

The BOI release of 8 July 2026 reports three materials projects:[6]

  • Taiwan Union Technology (Thailand) Co., Ltd., US$189.2 million (6.3 billion baht) in Chonburi, for copper-clad laminate and prepreg designed for AI servers and data centres.
  • Doosan Electro-Materials (Thailand) Co., Ltd., a unit of Doosan Corp., US$180.2 million (6 billion baht) in Samut Prakan, for copper-clad laminate and prepreg.
  • Fulltech Fiber Glass (Thailand) Co., Ltd., US$99.4 million (3.3 billion baht) in Chachoengsao, for specialised glass fibre fabric.

The release gives no construction or start dates. For Doosan, the Korea Times reported in May 2026 a plan to invest 180 billion won in a CCL plant of 72,700 square metres at the Araya Industrial Park, with two production lines at first, expandable to eight, and operations from the second half of 2028.[7] For Fulltech, the parent company's board approved phase one capital spending of about NT$3.1 billion for the Thai glass-fabric plant on 25 February 2026, with mass production planned for the third quarter of 2027.[8]

Announced

On 12 September 2025 Panasonic Industry announced an investment of about ¥17 billion in a new building at its Ayutthaya Plant, on the grounds of Panasonic Manufacturing Ayutthaya in the Rojana Industrial Park, for MEGTRON multi-layer circuit board materials. Operations are scheduled for November 2027 and mass production by the end of fiscal 2028.[10] The release does not say what the existing Ayutthaya plant makes today, so the row covers the new building.

Stated plans

PlantPlanStatedSource
ITEQ, Thailand600,000 sheets a month by the end of 2026; 1.2 million by the end of 2028October 2026[9]
Ventec, AyutthayaFormal mass production at the end of 2026; treating capacity from 2027October 2026[13]
Fulltech Fiber Glass (Thailand)Mass production in the third quarter of 2027February 2026[8]
Panasonic Industry, AyutthayaOperations in November 2027; mass production by the end of fiscal 2028September 2025[10]
Ventec, AyutthayaFull capacity at the end of a ramp through 2028October 2026[1]
Doosan Electro-Materials (Thailand)Operations in the second half of 2028May 2026[7]
Taiwan Union Technology (Thailand)No date in the BOI releaseJuly 2026[6]
Shengyi Technology (Thailand), Chachoengsao12 million square metres of laminate and 23.4 million metres of prepreg a year; no date given for full capacityJanuary 2026[17]
Nanya New Material (Thailand), Prachin BuriInvestment of not more than RMB 700 million; no capacity or start date givenJune 2023[19]

Qualification of a Thai-made material

IPC-4101 sets the requirements for base materials, laminate or prepreg, used primarily for rigid or multilayer printed boards. Each of its specification sheets sets requirements for both laminate and prepreg for one product grade.[12]

A material made in a new plant reaches a board order through several further steps. The reports of the Ventec opening name three: the commissioning of individual production processes, the qualification of material grades, and the completion of customer approvals. Commercial supply depends on all three.[2]

These steps apply grade by grade and customer by customer. An opening marks the plant as built; it does not show which grades have completed qualification or which customers have approved them, and the reports of the opening name neither.[1][2]

Volume also depends on the ramp. The planned figures describe the plant at full capacity, which the company places at the end of a ramp to 2028, not its output during the ramp; the reports do not state how output during the ramp is shared among grades or customers.[1][2][3]

Data and method

This article draws on Ventec International Group's own announcements of 17 December 2024 and 1 August 2025; the BOI release of 8 July 2026; Panasonic Industry's release of 12 September 2025; Shengyi Technology's filings with the Shanghai Stock Exchange of 29 July 2023 and 4 June 2025 and its interim report for 2026 (15 August 2026), its groundbreaking notice of December 2024 and its topping-out release as reproduced by the Hunan Electronic Circuit Industry Association (19 January 2026); Nanya New Material's filings of 26 June 2023 and 19 March 2025, with its groundbreaking notice as reproduced by the Guangdong Circuit Board Association (23 October 2026); the public excerpt of IPC-4101C; and reports by Evertiq (18 March and 26 October 2026), InElectronics (27 October 2026), Anue (26 October 2026), the Korea Times (11 May 2026), United Daily News (25 February 2026), the Liberty Times (8 October 2026) and Chemical Engineering (11 November 2025). The quotations were read on the publishers' pages on 28 October 2026, and those for Shengyi Technology, Nanya New Material and Anue on 31 October 2026. The register's rows are held as data, with their sources, and were checked on 31 October 2026.

A plant enters the register when a primary source, or two independent sources, confirm a site in Thailand. Its stage is the latest step reported by those sources; a BOI approval is recorded as approved. Provinces and estates are given as the sources state them. Planned capacity, ramp-up schedules, start dates and investment figures are reported as the companies' plans and are not counted as current supply. Output, utilisation and customer-qualified availability at the plants were not independently verified. No company was contacted. Interpretation is MPBxChange analysis.

Sources

  1. press Evertiq (2026). Ventec opens first Southeast Asian plant in Thailand. Evertiq. back to text
  2. press InElectronics (2026). Ventec opens PCB materials factory in Thailand. InElectronics. back to text
  3. press Evertiq (2026). Ventec to bring Thailand facility online in Q2 2026. Evertiq. back to text
  4. company Ventec International Group (2025). Thailand New Plant Breaks Ground, Projected for Mass Production in 2026. Ventec International Group. back to text
  5. company Ventec International Group (2024). Thailand Confirmed as Location for New PCB Material Manufacturing Facility. Ventec International Group. back to text
  6. official Thailand Board of Investment (BOI) (2026). Thailand Approves $1.99 Billion in New Investment, Led by AI and Advanced Electronics (release PR105_2569EN, 8 July 2026). BOI One Start One Stop Investment Center (OSOS). back to text
  7. press The Korea Times (2026). Doosan, Lotte plan aggressive investments in chip materials. The Korea Times. back to text
  8. press United Daily News (聯合報系) (2026). 富喬擴大資本支出 31億元啟動泰國第一期投資案. udn.com (United Daily News). back to text
  9. press Liberty Times Net (自由時報) (2026). 銅箔基板需求飆增 聯茂CCL月產能3年內拼915萬張. Liberty Times Net (自由財經). back to text
  10. company Panasonic Industry Co., Ltd. (2025). Panasonic Industry will Double the Production Capacity of MEGTRON Multi-layer Circuit Board Materials Over the Next Five Years. Panasonic Newsroom. back to text
  11. press Chemical Engineering (2025). Mitsubishi Gas Chemical expands electronic materials plant in Thailand. Chemical Engineering (chemengonline.com). back to text
  12. official IPC. IPC-4101C, Specification for Base Materials for Rigid and Multilayer Printed Boards (table of contents and scope, public excerpt). IPC. back to text
  13. press Anue (鉅亨網) (2026). CCL廠騰輝電子泰國新廠今開幕 昆山同步投資15億元擴產. Anue (cnyes.com). back to text
  14. company Guangdong Shengyi Technology Co., Ltd. (2023). 广东生益科技股份有限公司关于在泰国投资新建生产基地的公告 (2023-049) (Investment in a new production base in Thailand). CNINFO, Shanghai Stock Exchange filing, stock code 600183. back to text
  15. company Shengyi Technology (2024). 乘势攀高峰 扬帆泰起航:生益科技(泰国)有限公司奠基仪式隆重举行 (Groundbreaking ceremony of Shengyi Technology (Thailand)). Shengyi Technology (syst.com.cn), news page. back to text
  16. company Guangdong Shengyi Technology Co., Ltd. (2025). 广东生益科技股份有限公司关于在泰国投资新建生产基地的进展公告 (2025-032) (Progress of the Thailand production base). CNINFO, Shanghai Stock Exchange filing, stock code 600183. back to text
  17. press Hunan Electronic Circuit Industry Association (IC&PCB联盟), reproducing Shengyi Technology's release (2026). 总投资14亿!生益科技泰国项目封顶大吉 (Shengyi Technology's Thailand project tops out). IC&PCB联盟 (ic-pcb.cn). back to text
  18. company Guangdong Shengyi Technology Co., Ltd. (2026). 生益科技2026年半年度报告 (Interim report 2026). CNINFO, Shanghai Stock Exchange filing, stock code 600183. back to text
  19. company Nanya New Material Technology Co., Ltd. (2023). 南亚新材料科技股份有限公司关于在泰国投资新建生产基地的公告 (2023-039) (Investment in a new production base in Thailand). CNINFO, Shanghai Stock Exchange filing, stock code 688519. back to text
  20. company Nanya New Material Technology Co., Ltd. (2025). 南亚新材料科技股份有限公司关于在泰国投资新建生产基地的进展公告 (2025-004) (Progress of the Thailand production base). CNINFO, Shanghai Stock Exchange filing, stock code 688519. back to text
  21. press Guangdong Circuit Board Association (GPCA), source line 南亚新材NOUYA (2026). 又一PCB行业企业泰国生产基地奠基 (Another PCB-industry company breaks ground in Thailand). GPCA (spca.org.cn). back to text

How to cite: MPBxChange (2026). PCB materials made in Thailand: Ventec opens in Ayutthaya. MPBxChange research. https://www.mpbxchange.com/research/pcb-materials-made-in-thailand-ventec-ayutthaya